[Portfolio]
Physical Sciences Expansion

University of California

Davis, CA

Royal Electric was a major subcontractor on this project in which we performed the complete power, lighting, tele-data and FA for a 90,000sf 3-story classroom and physical science laboratory facility.

Additional Scope
Royal Installed 12kV service via [2] 15kVA liquid-filled transformers , [2] 1200A MSB’s with 65 branch panels throughout the building. Emergency power through a 500KW natural gas generator through [2] ATS.

Challenges Faced During the Job and Royal’s Solution
Excessive underground site congestion of new and existing services was solved with thorough coordination and cooperation between trades and detailed shop drawings for the joint trench from the existing electrical vault in the street and the building entrance. The above ceiling work of all trades was extensive. 6 months were spent in overhead coordination meetings with all trades and was successfully installed with a ¼” tolerance between systems.

 

project details
Owner :
University of California, Davis
General Contractor :
Flintco Inc.
Contract Value :
$5,487,359
Contract Time :
August 2007 – July 2010
Project Summary